摘要
对北京市南水北调南干渠盾构机穿越排气阀井施工方法进行了深度分析,通过优化招标图设计方案,采用在施工完成后的排气阀井内回填碎石+土层的方法,较全面地进行了方案设计,安全、快速完成施工任务。
In this paper,indepth analysis on the shield machine tunnel through exhaust valve well in South to North Water Diversion project in Bejing.By optimizing the bidding pattern design,exhaust valve well backfilled with gravel + soil used after the completion was adopted.The comprehensive scheme design makes safe,speedy construction a reality.
引文
[1]张永波,孙新忠.基坑降水工程[M].北京:地震出版社,2000:40-63.
[2]江正荣.建筑施工计算手册[M].2版.北京:中国建筑工业出版社,2007:237-264.
[3]徐辉,李向东.地下工程[M].武汉:武汉理工大学出版社,2009:178-225.