高风险岩溶隧道突水突泥灾害前兆规律与应用研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
隧道突水突泥会对工程建设带来巨大的安全隐患和经济损失,逐渐成为高风险岩溶隧道施工急需解决的关键科学技术难题。在系统收集整理大量岩溶隧道突水突泥实例的基础上,总结出包括地下水、岩组、地质结构面、岩层产状、沉积期古剥蚀面、地形地貌和降雨等7大主要地质影响因素,研究了岩溶水体和不良地质体在地球物理场上表现出的响应特征,即在地震波、电磁场的传播过程中,遇到该类介质时某种特殊的前兆信号信息,解译岩溶水体和不良地质体在地球物信息场上的响应特征,辨识导致灾变的前兆信息,并在实际隧道工程施工中得到了成功的应用,对建立突水突泥预测预报方法具有非常重要的理论价值和工程指导意义。
Tunnel inrush of clay and water,which has become the key technology that needs to be solved for the construction of high risk karst tunnels,brings huge security risks and economic losses.On the basis of many examples of karst water inrush and sudden mud of tunnels,ground water,petrofabric,geological structure surface structures,attitude of rocks,deposition of ancient erosion surface,topography and geomorphology and rainfall were the main geological influence factors on water inrush and sudden mud.The response characteristics of karst water and unfavorable geological condition in the geophysical field have been researched.That is the particular type of precursor signal information when the seismic waves and electromagnetic waves encounter the karst water and unfavorable geological condition in its propagation process.The response characteristics of the karst aquifer and unfavorable geological body in the geophysical information field were interpreted.The precursor signal information that led to the disaster was recognized.This was successfully applied in the tunnel construction and was significant in the prediction of water inrush and sudden mud of tunnels.
引文
[1]王梦恕.对岩溶地区隧道施工水文地质超前预报的意见[J].铁道勘查,2004(1):7-9.WANG Mengshu.Hydrologic and geological forecast oftunnel construction in the karst district[J].Railroad Sur-vey,2004(1):7-9.
    [2]李术才,李树忱,张庆松,等.岩溶裂隙水与不良地质情况超前预报研究[J].岩石力学与工程学报,2007,26(2):217-225.LI Shucai,LI Shuchen,ZHANG Qingsong,et al.For-cast of karst-fractured groundw ater and defective geolog-ical conditions[J].Chinese Journal of Rock Mechanicsand Engineering,2007,26(2):217-225.
    [3]WANG Taitien,WANG Wenli,LIN Mingleng.Harness-ing the catastrophic inrush of w ater into new yungchurenTunnel in Taiw an[J].Tunnelling and Underground SpaceTechnology,2004,19(4-5):418.
    [4]李利平,李术才,张庆松.岩溶地区隧道裂隙水突出力学机制研究[J].岩土力学,2010,31(2):524-528.LI Liping,LI Shucai,ZHANG Qingsong.Study ofmechanism of w ater inrush induced by hydraulic fracturingin karst tunnels[J].Rock and Soil Mechanics,2010,31(2):524-528.
    [5]刘志刚.概论岩溶或地质复杂隧道隧洞地质灾害超前预报技术[J].铁道建筑技术,2003(2):1-5.LIU Zhigang.On advance geological forecast of tunnelson karst or varied geological conditions[J].Railw ay Con-struction Technology,2003(2):1-5.
    [6]李利平.高风险岩溶隧道突水灾变演化机理及其应用研究[D].济南:山东大学,2009.LI Liping.Study on catastrophe evolution mechansim ofkarst w ater inrush and its eengineering application of highrisk karst tunnel[D].Jinan:Shandong University,2009.
    [7]刘招伟.圆梁山隧道岩溶突水机理及其防治对策[D].北京:中国地质大学,2004.LIU Zhaow ei.Study on karst w ater burst mechanism andprevention countermeasures in Yuanliangshan tunnel[D].Beijing:China University of Geosciences,2004.
    [8]李利平,路为,李术才,等.地下工程突水机理与防治对策的研究现状及发展趋势分析[J].山东大学学报:工学版,2010,40(3):104-112.LI Liping,LU Wei,LI Shucai,et al.Research status anddeveloping trend analysis of the w ater inrush mechanismfor underground engineering construction[J].Journal ofShandong University:Engineering Science,2010,40(3):104-112.
    [9]王唢,赵明阶,林志.公路隧道施工常见地质灾害问题综述[J].公路交通技术,2009(1):102-106.WANG Suo,ZHAO Mingjie,LIN Zhi.Summary ofCommon Geologic Hazards during Highw ay Tunnel Con-struction[J].Technology of Highw ay and Transport,2009(1):102-106.
    [10]李利平,李术才,陈军,等.基于岩溶突涌水风险评价的隧道施工许可机制及其应用研究[J].岩石力学与工程学报,2011,30(7):1345-1354.LI Liping,LI Shucai,CHEN Jun,et al.Construction li-cense mechanism and its application based on karst w aterinrush risk evaluation[J].Chinese Journal of Rock Me-chanics and Engineering,2011,30(7):1345-1354.
    [11]许振浩,李术才,李利平,等.基于风险动态评估与控制的岩溶隧道施工许可机制[J].岩土工程学报,2011,33(11):1715-1725.XU Zhenhao,LI Shucai,LI Liping,et al.Constructionpermit mechanism of karst tunnels based on dynamic as-sessment and management of risk[J].Chinese Journal ofGeotechnical Engineering,2011,33(11):1715-1725.
    [12]李大心.探地雷达方法与应用[M].北京:地质出版社,1994.
    [13]吴俊,毛海和,应松,等.地质雷达在公路隧道短期地质超前预报中的应用[J].岩土力学,2003,24(增刊):154-157.WU Jun,MAO Haihe,YING Song,et al.Application of ground probing radar to short-term geological forecast for tunnel construction[J].Rock and Soil Mechanics,2003,24(Supp):154-157.
    [14]刘斌,李术才,李树忱,等.复信号分析技术在地质雷达预报岩溶裂隙水中的应用研究[J].岩土力学,2009,30(7):2191-2196.LIU Bin,LI Shucai,LI Shuchen,et al.Study of appli-cation of complex signal analysis to predicting karst-frac-tured ground w ater w ith GPR[J].Rock and Soil Me-chanics,2009,30(7):2191-2196.
    [15]许振浩,李术才,张庆松,等.TSP超前地质预报地震波反射特性研究[J].地下空间与工程学报,2008,4(4):640-644.XU Zhenhao,LI Shucai,ZHANG Qingsong,et al.Re-flection characteristic of seismic w ave in TSP advance geological prediction[J].Chinese Journal of Under-ground Space and Engineering,2008,4(4):640-644.
    [16]张庆松,李术才,孙克国,等.公路隧道超前地质预报应用现状与技术分析[J].地下空间与工程学报,2008,4(4):766-711.ZHANG Qingsong,LI Shucai,SUN Keguo,et al.A-nalysis and present state of advance geological forecast technology of highw ay tunnel[J].Chinese Journal of Underground Space and Engineering,2008,4(4):640-644.
    [17]Andisheh Alimoradi,Ali Moradzadeh,Reza Naderi,et al.Prediction of geological hazardous zones in front of a tunnel face using TSP-203and artificial neural netw orks[J].Tunneling and Underground Space Technology,2008,23(6):711-717.
    [18]李天斌,孟陆波,朱劲,等.隧道超前地质预报综合分析方法[J].岩石力学与工程学报,2009,28(12):2429-2436.LI Tianbin,MENG Lubo,ZHU Jin,et al.Comprehen-sive analysis method for advanced forecast of geology in tunnels[J].Chinese Journal of Rock Mechanics and En-gineering,2009,28(12):2429-2436.
    [19]李永鸿,徐光黎,杨银湖,等.地震反射波法技术及其在隧道超前地质预报中的应用研究[J].岩土工程学报,2005,27(10):1181-1184.LI Yonghong,XU Guangli,YANG Yinhu,et al.Ap-plication of earthquake refracted w ave method to geolog-ical prediction for tunnel.Chinese Journal of Rock Me-chanics and Engineering,2005,27(10):1181-1184.
    [20]薛翊国,李术才,张庆松,等.隧道信息化施工岩溶裂隙水超前地质预报[J].岩土力学,2008,29(12):3360-3364.XUE Yiguo,LI Shucai,ZHANG Qingsong,et al.Geo-logical prediction of karst-fractured groundw ater in tunnel informational construction[J].Rock and Soil Mechan-ics,2008,29(12):3360-3364.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心