大跨度连续刚构桥抗震性能分析与改造策略
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
结合一座大跨度连续刚构桥实例,分析了在地震作用下该种桥梁的地震反应,通过改造桥梁形式,减小结构地震力.分析表明,刚构桥的基本周期较短,地震力较大;改造成采用减隔震支座的连续梁桥后,墩柱的地震力明显下降,桩基的轴力也下降明显,但是对于桩基的弯矩减小不大,但是整体上改造后对抗震有利.
in this paper,combining with the department of a large span continuous rigid frame bridge as an example,analyzed this kind of the seismic response of the bridge under seismic action,through the bridge form,reduce the earthquake force of the structure. Through the analysis found that bridge the basic cycle is shorter,seismic force is bigger; Modified into isolation bearing is continuous girder bridge,significantly lower pier earthquake force,axial force of pile foundation also decreased significantly,but for the pile bending moment of the decrease is not big,but good for seismic after overall transformation.
引文
[1]范立础.桥梁工程[M].北京:人民交通出版社,1997.
    [2]杨高中,杨征宇,周军生,李强,宋贵峰.连续刚构桥在我国的应用和发展[J].公路,1998,(06).
    [3]范立础,胡世德,叶爱君.大跨度桥梁抗震设计[M].北京:人民交通出版社,2001.
    [4]郑史雄,奚绍中,杨建忠.大跨度刚构桥的地震反应分析[J].西南交通大学学报,1997,(06).
    [5]范立础,聂利英,李建中.地震作用下板式橡胶支座滑动的动力性能分析[J].中国公路学报,2003,(04).

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心