剪切波作用下盾构隧道地震效应的拟静力分析方法研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
针对均质土层中圆形盾构隧道在水平剪切波作用下的地震响应分析问题,在获得隧道周边自由场剪切应力的基础上,利用弹性中心法和空洞复变函数,给出了深埋盾构隧道在土层结构界面滑移和不滑移情况下的解析分析公式;并建立相同条件的等效刚度数值分析模型和考虑接头效应的有接头分析模型进行对比。研究表明:等效刚度拟静力法与等效刚度数值法所获得的剪切地震波作用附加弯矩、附加轴力分布形态及其最大值发生位置都具有良好的一致性;在三种方法获得的附加弯矩和附加轴力当中,等效刚度拟静力法最大,等效刚度数值法次之,有接头数值法最小;土层结构界面滑移相对不滑移而言,附加轴力偏小、附加弯矩偏大;等效刚度拟静力法结果偏于安全,公式简便,考虑界面滑移时更加接近实际,故可推荐考虑滑移条件的等效刚度拟静力法作为深埋圆形盾构隧道的抗震设计方法,并与常时荷载静力分析结果叠加后进行配筋设计。
Based on the distribution of free-field shear stress around the tunnel, utilizing the elastic center method and the cavity complex variable function, this paper presents an analytic formula for the seismic response of circular deep-buried shield tunnel, where slip and non-slip contacting conditions are imposed to the soil-structure interface respectively and the tunnel is subjected to horizontal shear waves in homogeneous soil. Furthermore, a comparison is made between the equivalent stiffness numerical analytic model and the analytic model considering the effect of joints, showing that the equivalent stiffness quasi-static method and the equivalent stiffness numerical method generate reasonably consistent results in the distribution of shear-wave induced bending moment and axial force as well as the position where the induced bending moment and the axial force reach the maximum. The equivalent stiffness quasi-static method generates the maximum results, followed by the equivalent stiffness numerical method and the analytic model considering the effect of joints. Moreover, considering soil-structure interface slip results in a smaller induced axial force and a larger induced bending moment. In conclusion, the equivalent stiffness quasi-static method takes soil-structure interface slip into consideration, which coincides with practical condition and presents higher safety coefficient and formula simplicity. Consequently, it can be suggested as the anti-seismic design approach for deep-buried circular shield tunnel, and the superposition of the results of constant load static analysis can be conducted to determine the reinforcement design.
引文
[1]Penzien J,Wu C L.Stresses in linings of bored tunnels[J].Earthquake Engineering and Structural Dynamics,1998(27):283―300.
    [2]Joseph Penzien.Seismically induced racking of tunnel linings[J].Earthquake Engineering and Structural Dynamics,2000,29:683―691.
    [3]Hashash Y M A,Hook J J,Schmidt B,Yao John Ichiang.Seismic design and analysis of underground structures[J].Tunneling and Underground Space Technology,2001,16(4):247―293.
    [4]Park Kyung Ho,Kullachai Tantayopin,Bituporn Tontavanich,Adisorn Owatsiriwong.Analytical solution for seismic-induced ovaling of circular tunnel lining under no-slip interface conditions:A revisit[J].Tunneling and Underground Space Technology,2009,24(2):231―235.
    [5]张栋梁,杨林德,谢永利,等.盾构隧道抗震设计计算的解析解[J].岩石力学与工程学报,2008,27(3):543―549.Zhang Dongliang,Yang Linde,Xie Yongli,et al.Analytical solution for aseismic design calculation offshield tunnels[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(3):543―549.(in Chinese)
    [6]晏启祥,马婷婷,何川,等.盾构隧道抗震分析近似解析解及其应用[J].西南交通大学学报,2010,45(3):341―345.Yan Qixiang,Ma Tingting,He Chuan,et al.Approximate Analytical Solution of A seismic Analysis of Shield Tunnel and Its Application[J].Journal of Southwest Jiaotong University,2010,45(3):341―345.(in Chinese)
    [7]董正方,王君杰,姚毅超.深埋盾构隧道结构抗震设计方法评价[J].振动与冲击,2012,31(19):79―85.Dong Zhengfang,Wang Junjie,Yao Yichao.Evaluation of seismic design methods for a deeply-buried shield tunnel[J].Journal of Vibration and Shock,2012,31(19):79―85.(in Chinese)
    [8]杨智勇,黄宏伟,张冬梅,等.盾构隧道抗震分析的静力推覆方法[J].岩土力学,2012,33(5):1381―1388.Yang Zhiyong,Huang Hongwei,Zhang Dongmei,et al.Pushover method for seismic analysis of shield tunnel[J].Rock and Soil Mechanics,2012,33(5):1381―1388.(in Chinese)
    [9]耿萍,何川,晏启祥.水下盾构隧道抗震设计分析方法的适应性研究[J].岩石力学与工程学报,2007,26(增刊2):3625―3630.Geng Ping,He Chuan,Yan Qixiang.Applicability study on aseismic design method of submarine shield tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(Suppl 2):3625―3630.(in Chinese)
    [10]祝彦知,冯紫良,方志.地震动下考虑各向异性土体-盾构隧道数值模拟[J].岩土力学,2005,26(5):710―716.Zhu Yanzhi,Feng Ziliang,Fang Zhi.Numerical simulation of shield tunnel dynamic response to earth motions taking account of anisotropy of layered soil[J].Rock and Soil Mechanics,2005,26(5):710―716.(in Chinese)
    [11]丁峻宏,金先龙,郭毅之,等.盾构隧道地震响应的三维数值模拟方法及应用[J].岩石力学与工程学报,2006,25(7):1430―1436.Ding Junhong,Jin Xianlong,Guo Yizhi,et al.Three-dimensional numerical simulation method and its application to seismic response of shield tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(7):1430―1436.(in Chinese)
    [12]苏宗贤,何川.盾构隧道管片衬砌内力分析的壳-弹簧-接触模型及其应用[J].工程力学,2007,24(10):231―235.Su Zongxian,He Chuan.Shell-spring-contact model for shield tunnel segmental lining analysis and its application[J].Engineering Mechanics,2007,24(10):231―235.(in Chinese)
    [13]刘干斌,谢康和,施祖元.粘弹性饱和土中深埋圆形隧道衬砌-土相互作用[J].工程力学,2005,22(6):148―154.Liu Ganbin,Xie Kanghe,Shi Zuyuan.Soil-structure interaction of a deep circular tunnel in viscoelastic saturated soil[J].Engineering Mechanics,2005,22(6):148―154.(in Chinese)
    [14]刘晶波,王文晖,赵冬冬.地下结构横截面地震反应拟静力计算方法对比研究[J].工程力学,2013,30(1):105―111.Liu Jingbo,Wang Wenhui,Zhao Dongdong.Comparison of the pseudo-static methods for seismic analysis of the underground structures[J].Engineering Mechanics,2013,30(1):105―111.(in Chinese)
    [15]Wang J N.Seismic design of tunnels:a simple state-of-the-art approach[M].New York:Parsons Brinckerhoff Inc,1993:15―25.
    [16]Hassan Sedarat,Alexander Kozak,Youssef M A.Hashash,etc.Contact interface in seismic analysis of circular tunnels[J].Tunneling and Underground Space Technology,2009,24:482―490.
    [17]曾东洋,何川.地铁盾构隧道管片接头刚度影响因素研究[J].铁道学报,2005,27(4):90―95.Zeng Dongyang,He Chuan.Study on Factors Influential in Metro Shield Tunnel Segment Joint Bending Stiffness[J].Journal Of The China Railway Society,2005,27(4):90―95.(in Chinese)
    [18]刘学山.盾构隧道管片横向接头刚度对内力影响的研究[J].现代隧道技术,2003,40(4):14―19.Liu Xueshan.A study on the effect of the stiffness of the end joints of shield tunnel segments to the internal force of lining[J].Modern Tunneling Technology,2003,40(4):14―19.(in Chinese)
    [19]何英杰,袁江.影响盾构隧道衬砌接头刚度的因素[J].长江科学院院报,2001,18(1):20―26.He Yingjie,Yuan Jiang.Factors affecting joint stiffness of shield tunnel lining[J].Journal of Yangtze River Scientific Research Institute,2001,18(1):20―26.(in Chinese)
    [20]李志业,曾艳华.地下结构设计原理与方法[M].成都:西南交通大学出版社,2003:165―168.Li Zhiye,Ceng Yanhua.Design theory and method of underground structure[M].Cheng Du:Southwest Jiaotong University Press,2003:165―168.(in Chinese)

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心