建筑施工项目进度、成本和质量目标的综合优化
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
进度、成本和质量是建筑工程项目管理的三大控制目标 .本文在具体分析三者之间相互作用关系的基础上 ,探讨了对三大控制目标进行综合优化的理论与方法 ,并结合工程实例进行了验算 .结果表明 ,应用综合优化模型 ,可以方便地对工程项目的进度、成本和质量控制目标作出优化决策 ,从而提高项目的施工效率和工程效益 .
Time, cost and quality are the most important control objects of project management. On the basis of analyzing the relations among the three objects, this paper discusses some theories and methods about the comprehensive optimization of the objects. And it gives a practical example on construction project calculation. It is indicated that a strategic decision on comprehensive optimization of the time, cost and quality can be made by applying optimization models of these three objects. Thus the efficiency and benefit of construction project are raised.