施工网络进度计划的多目标优化
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
通过对施工网络进度计划的研究 ,提出一种新的评价准则——工程质量 ,并建立了网络计划的数学模型 .同时综合前人已研究出的各种优化方法 ,得出网络计划的多目标优化模型 .由于各优化目标之间的矛盾性 ,用多目标决策理论可以科学客观地优化网络计划
Based on the study of construction network project, the authors pose a new estimate criterion: construction quality and set up the network's mathematics model. Simultaneously, the authors establish the network's multi\|goal model by synthesizing the existing optimum models. Because the goals contradict each other, the authors can optimize network project scientifically and objectively by using the multi\|goal decision theory.
引文
[1] DoBaKhang,YinMonMyint.Time,costand quality trade-off in project management:a case study[J].Interna-tionalJournal ofProjectManagement,1999,17(4):105-114.
    [2] RogerAtkinson.ProjectManagement:cost,time and quality two bestguessesand a phenomenon,it′s time to acceptother success criteria[J].InternationalJournal ofProjectManagement,1999,17(6):337-342.
    [3] 侍克斌.水利水电枢纽工程过水围堰设计方案优选[M].乌鲁木齐:新疆人民出版社,2000.
    [4] 杨劲,李世蓉.建设项目进度控制[M].北京:地震出版社,1993.
    [5] 宣以政.工程项目网络计划的综合优化及其动态优化管理[J].成都大学学报,1996,15(2):38-42.
    [6] 刘光庭.质量管理[M].北京:清华大学出版社,1986

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心