摘要
以新疆某污水库改扩建工程为例,对库坝的渗漏、渗透变形、地震液化和腐蚀性问题进行了研究,对同类工程具有一定的参照作用。
Seepage deformation of silty soil reservoir dam is the key factor of its stability.Taking a sewerage reservoir extension as an example,the paper studies the dam seepage.Seepage deformation and liquefaction and erosion of the site.The results can be taken as reference to similar engineerings.
引文
[1]中国地震动参数区划图(GB18306-2001)[S].
[2]水利水电工程地质勘察规范(GB50287-99)[S].
[3]新疆兵团勘测规划设计研究院.新疆独山子乙烯污水排蓄工程工程地质勘察报告[R].1992年5月
[4]唐大维,孙愫文.工程岩土学[M].北京:地质出版社,1987