引江济汉工程渠道4标施工进度控制与评价
详细信息    查看官网全文
摘要
依据南水北调中线一期引江济汉工程建设荆州段施工进度控制与管理的现状,以及《水利水电工程施工总进度设计规范》(SL 643—2013)的有关要求。采用AHP方法,建立了水利工程建设施工进度评价指标体系和评价阈值,分析了工程施工进度管理体系建设、工程施工进度控制与管理措施、工程施工计划完成情况等敏感指标,并对其进行评价。结论为:工程建设施工进度与管理控制综合评价值G=0.92,评价为优良,符合实际情况。
According to the first phase of the south-to-north water transfer project jingzhou Yin Jiang Ji han construction period of the present the construction progress control and management,as well as specification for design of water conservancy and project construction schedule(SL 643-2013) the relevant requirements.Using AHP method,established the evaluation index system of water conservancy project construction schedule and evaluation threshold,the analysis of the engineering construction schedule management system construction,engineering construction progress control and management measures,the engineering construction project completion and other sensitive indicators,and carries on the appraisal.The conclusion is;the project construction schedule and management control G =0.92 the integrated evaluation,evaluation for good,in line with the actual situation.
引文
[1]刘伊生.工程项目进度计划与控制[M].北京:中国建筑工业出版社,2008:4~5.
    [2]盖青,王在亮.浅谈水利工程施工进度控制[J].经营管理者,2012,(01):335.
    [3]SL 643-2013.水利水电工程施工总进度设计规范[S].2013.
    [4]GB/T 50927-2013.大中型水电工程建设风险管理规范[S].2013.
    [5]王伟哲.大型水利水电工程施工进度控制与优化[D].保定:河北农业大学,2012:13~18.
    [6]于金龙.焦燕彬,杨林振等.遗传算法在水利工程施工进度优化中的应用研究[J].中国农村水利水电,2013,(11):72~75.
    [7]中国水利工程协会组织.水利工程建设进度控制[M].北京:中国水利水电出版社,2007:3~8.
    [8]田志国,张福江.水利工程施工进度控制分析研究[J].中国科技投资,2014(A15):398.
    [9]张笑天,陈崇德.漳河水库灌区水资源脆弱性评价研究[J].华北水利水电学院学报,2010,31(2):12~15.
    [10]彭锋,兰阳,熊伟等.引江济汉工程渠道4标施工总体布置及评价[J].水科学与工程技术,2014,(6):65~68.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700