Optimizing dewatering design for a metro station on the Chengdu Metro Line 7
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Optimizing dewatering design for a metro station on the Chengdu Metro Line 7
  • 作者:LI ; Ke ; KANG ; Xiao-bing
  • 英文作者:LI Ke;KANG Xiao-bing;State Key Laboratory of Geohazard Prevention and Geoenvironment Protection at Chengdu University of Technology;
  • 英文关键词:Underground space;;Objective function;;Dewatering design optimization;;Programming solver
  • 中文刊名:DXSG
  • 英文刊名:地下水科学与工程(英文版)
  • 机构:State Key Laboratory of Geohazard Prevention and Geoenvironment Protection at Chengdu University of Technology;
  • 出版日期:2019-06-15
  • 出版单位:Journal of Groundwater Science and Engineering
  • 年:2019
  • 期:v.7;No.25
  • 基金:supported by State Key Laboratory of Geohazard Prevention and Geoenvironment Protection Independent Research Project (SKLGP2018Z018)
  • 语种:英文;
  • 页:DXSG201902006
  • 页数:10
  • CN:02
  • 分类号:65-74
摘要
At present, most calculation results regarding foundation pit dewatering are ideal values, making construction resources prone to being wasted. In order to optimize the traditional pipe well design of large wells, the linear programming solution module in Excel is used, with the total water inflow taken as the objective function, the water level drawdown used as the constraint and test condition, and a station project on the Chengdu Metro Line 7 serving as the subject of this study. The total water inflow of the traditional pipe well design is optimized by the simplex method, producing a total water inflow of 4 040.65 m~3/d, which, compared with 4 829.79 m~3/d, the total water inflow calculated by means of the traditional design optimization method, engenders a reduction of roughly 16% per day. The feasibility of the optimization methodology is verified by the drawdown constraint, which reveals the decrease of construction costs and the diminution of the influence that the lowered groundwater level has on the surroundings of the metro station. Finally, references are provided as to optimizing the dewatering designs for other metro stations in similar engineering and hydrogeological conditions.
        At present, most calculation results regarding foundation pit dewatering are ideal values, making construction resources prone to being wasted. In order to optimize the traditional pipe well design of large wells, the linear programming solution module in Excel is used, with the total water inflow taken as the objective function, the water level drawdown used as the constraint and test condition, and a station project on the Chengdu Metro Line 7 serving as the subject of this study. The total water inflow of the traditional pipe well design is optimized by the simplex method, producing a total water inflow of 4 040.65 m~3/d, which, compared with 4 829.79 m~3/d, the total water inflow calculated by means of the traditional design optimization method, engenders a reduction of roughly 16% per day. The feasibility of the optimization methodology is verified by the drawdown constraint, which reveals the decrease of construction costs and the diminution of the influence that the lowered groundwater level has on the surroundings of the metro station. Finally, references are provided as to optimizing the dewatering designs for other metro stations in similar engineering and hydrogeological conditions.
引文
CHEN Min,FENG Zhe-gen,ZHU Hong-bing.2009.Application of deep well pump wellpoints dewatering in treatment of defective pile foundation.Technology of Highway and Transport,(4):109-110.
    HUANG Qiang.1999.Architectural survey.Application manual of building foundation pit support technical regulations.Beijing:China Building Industry Press.
    LI Zai-xing,LIANG Xin,et al.2009.Application of large well method in the calculation of foundation pit water inflow.Yangtze River,15:50-52.
    LI Zhen-hua,XU Ming-gang,YUAN Lu.2018.Application of tube well dewatering and light well point drainage in Jiangxinzhou Plain.Jiangsu Water Resources,06:50-53.
    LV Jin-peng.2014.Optimal design and numerical simulation of deep foundation pit well point dewatering.Shenyang:Shenyang Jianzhu University.
    SUN Qiang,LI Hou-en,et al.2006.Analysis of foundation pit collapse caused by groundwater.Journal of Geotechnical Engineering,28(s):1428-1432.
    SUN Rong-lin,LIANG Xing,et al.2003.Application of numerical modeling to dewatering design for foundation pit.Chinese Journal of Rock Mechanics and Engineering,(z1):2333-2337.
    TANG Cui-ping,XU Ye-shuang,et al.2005.Impact analysis of groundwater withdrawal during excavation of a deep foundation pit.Chinese Journal of Underground Space and Engineering,4:634-637.
    TANG Huan-wen,QIN Xue-zhi.1994.Practical optimization methods.Dalian:Dalian University of Technology Press.
    TENG Kai,WANG Ke-ming.1995.Optimization of foundation pit well group dewatering.Engineering Investigation,7(2):26-32.
    WU Yi-qian.2016.Research on the deformation due to dewatering and excavation of deep foundation pit of subway station in phreatic aquifer.Lanzhou:Lanzhou University of Technology.
    XU Yan.2013.Optimal dewatering analysis of well group based on objective function method and finite element method.Shenyang:Northeastern University.
    XU Yan,ZHAO Wen,LI Shen-gang.2009.Optimization of multi-well dewatering based on objective function for a subway tunnel.Hydrogeology and Engineering Geology,36(5):98-101.
    YUAN Yong,SUN Jun.1994.Objective function in optimal back analysis of rock engineering.Chinese Journal of Geotechnical Engineering,16(2):29-37.
    YU Dan,LU Jin-peng,ZHUANG Yan.2014.Optimal design for foundation pit dewatering based on objective function controlled by drawdown.Journal of Water Resources and Architectural Engineering,12(2):62-66.
    ZHANG Yao-lei.2016.Analysis of surface settlement due to a station dewatering of Changchun subway engineering.Changchun Institute of Technology.
    ZHAO Jian-bin,ZHANG Zhi-qiang,et al.2009.Application of radiation-well in dewater of Shenyang Subway Line 1.Journal of Shenyang Jianzhu University(Natural Science),25(3):501-504.
    ZHAO Rui,XU Mo,et al.2016.Quantitative research on the geo-environment problems caused by rising water level during the construction of Chengdu Metro Line 7.Urban Mass Transit,19(9):80-86.
    ZHAO Zhen,LI Gui-ren.2014.Numerical simulation of land subsidence in the optimized pit dewatering.Groundwater,4:43-45.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700