摘要
针对鹤壁九矿东总回风巷受上方工作面跨采影响导致巷道变形严重的问题,采用数值模拟方法分析了上方工作面推进至不同距离时巷道围岩应力演化规律。基于此提出了针对性的支护对策并进行了工业性试验,矿压监测结果显示围岩控制效果较好。
According to the serious roadway deformation problem of east return airway resulting from the overhead mining above the working face in Hebi No.9 coal mine,analyzes the stress evolution law for surrounding rock of roadway with the different advance distance of mining workface by numerical simulation. Based on the above evolution law,proposes the pertinent tunnel support strategy and the industrial tests are carried out,the monitoring results of rock pressure show that the proposed tunnel support strategy has good control effect of the deformation of the surrounding rock.
引文
[1]陈炎光,钱鸣高.中国煤矿采场围岩控制[M].徐州:中国矿业大学出版社,1994.
[2]汤雪唯,张向阳.深井跨采巷道围岩应力分布及变形规律模拟研究[J].煤炭技术,2010,29(3):189-192.
[3]陈上元,宋常胜,郭志飚,等.深部动压巷道非对称变形力学机制及控制对策[J].煤炭学报,2016,41(1):246-254.
[4]刘立民,张进鹏,张玉涛.茌平煤田特深矿井围岩应力分析与大巷支护控制研究[J].煤炭技术,2017,36(1):19-21.
[5]张向阳,常聚才,王磊.深井动压巷道群围岩应力分析及煤柱留设研究[J].采矿与安全工程学报,2010,27(1):72-76.
[6]王卫军,袁越,余伟健,等.采动影响下底板暗斜井的破坏机理及其控制[J].煤炭学报,2014,39(8):1 463-1 472.