用户名: 密码: 验证码:
Deformation and Damage of Hard Rock Mass River Bed Due to Dam Foundation Excavation under High In-Situ Stress
详细信息   
摘要


     The rock mass forming the dam foundation of Xiao Wan hydroelectric station during excavation revealed a series of deformation and fracture phenomena.It mainly behaved as a split plate and surface rock bursts,and cracks along the existing structure,expansion and dislocation,and so on.On the basis of the analyses of the abovementioned phenomena,this paper studies the geological mechanic response of the rock mass due to the dam foundation excavation in the high in-situ stress environment.It is found that the rock mass deformation during excavation is mainly concentrated on the shallow surface of the dam foundation,which has time effect characteristics.According to analyses of deformation-destruction phenomenon and the study of deformation responses,the mechanism of deformation-destruction is understood.The mechanism applies to the excavation of the hard rock river bed of the dam foundation in the high in-situ stress environment.Shallow and superficial transformation result from the stress redistributed during down-cutting of river and unloading of excavation.Ultimately,it can be summarized that the deformation and fracture of river bed are a pressure rupture-unloading rebound model,and the pressure-rupture is the main type.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700