摘要
The local geological conditions are strong weathered,strong unloading anti-dip thin layer-middle-thick layer sand slate with joints and fractures developing,broken surrounding rocks,open fissures and serious loose unloading in road slope excavation at Lianghekou hydropower station.The frame beams and non-cohesive steel strand dispersion-type pre-stressed anchorage cable were designed to reinforce the side slope.The paper describes the super grouting control technique for pre-stressed anchor grouting in poor geological conditions.