摘要
In view of the special site conditions of the Mengshan mined-out area in Taiyuan City,i.e., the considerable terrain fluctuation and the need of curved line measurement,the authors propose the integrated geophysical methods that combine the array-form measurement of high-density resistivity method with the single-point measurement of Transient Electomagnetic Method(TEM).With the integrated geophysical methods,the location and the distribution of the mined-out area are detected,and later drilling verified that the integrated geophysical methods are effective.