基于变形的框架-剪力墙结构地震内力实用计算方法
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
为确保高层框架-剪力墙结构多道抗震防线性能的合理实现,《高层建筑混凝土结构技术规程JGJ 3-2002》修改了框架-剪力墙结构中框架柱地震剪力的调整方法;该文在参考文献《高层框-剪结构中框架地震内力的确定》的研究基础上,提出一种基于结构变形指标并考虑剪力墙刚度退化的框架-剪力墙混凝土结构框架地震剪力的分段实用计算方法;通过工程实例把该文方法与《高层建筑混凝土结构技术规程JGJ 3-2002》方法的计算结果进行了比较和分析;实例表明:《高层建筑混凝土结构技术规程JGJ 3-2002》的调整方法是十分必要的,该文方法可作为规范补充和完善的重要参考。
In order to insure the multiple aseismic fortification line performance for a frame-shear wall structure in tall buildings,in the "JGJ 3-2002,Technical specification for concrete high-rise building" the calculation method for the seismic shearing force of frame columns of a frame-shear wall structure has been modified.Based on the "Determination of seismic forces acting on frame in high-rise frame-shear wall structures" study,in this paper a practical approach in segments for the seismic shearing force of a frame-shear wall structure is finally presented,which is based on a deformation index,and at the same time,the stiffness degeneration on the shear wall is taken into account.Furthermore,this method is compared with the former by the result of an example.The results indicate that this method is necessary and available.This method supplies an important reference for the supplement of design codes.
引文
[1]JGJ 3-2002,高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2002.JGJ 3-2002,Technical specification for concrete high-rise building[S].Beijing:China Architecture Industry Press,2002.(in Chinese)
    [2]刘建新.高层框-剪结构中框架地震内力的确定[J].建筑结构学报,1999,20(3):15―22.Liu Jianxin.Determination of seismic forces acting on frame in high-rise frame-shear wall structures[J].Journal of Building Structures,1999,20(3):15―22.(in Chinese)
    [3]武藤清.结构物动力设计[M].北京:中国建筑工业出版社,1984.Muto Kiyoshi.Structural dynamic design[M].Beijing:China Architecture Industry Press,1984.(in Chinese)
    [4]李少泉,沙镇平.钢筋混凝土多高层建筑结构在地震作用下的割线刚度分析法[J].土木工程学报,2003,36(8):37―42.Li Shaoqun,Sha Zhenping.Secant stiffness analysis method of R.C.high-rise building structures under seismic actions[J].China Civil Engineering Journal,2003,36(8):37―42.(in Chinese)
    [5]李少泉,沙镇平.高层框架-抗震墙结构在地震作用下内力重分布的近似计算[J].土木工程学报,2005,38(2):32―37.Li Shaoqun,Sha Zhenping.Approximate calculation of the internal force redistributions of frame-wall structures under seismic effects[J].China Civil Engineering Journal,2005,38(2):32―37.(in Chinese)
    [6]孟焕陵,沈蒲生.基于刚度退化的框-剪结构受力性能研究[J].铁道科学与工程学报,2006,3(1):12―17.Meng Huanling,Shen Pusheng.Research on behaviors of frame-shear wall structures based on stiffness degradation[J].Journal of Railway Science and Engineering,2006,3(1):12―17.(in Chinese)
    [7]刘建新.考虑剪力墙刚度退化时高层框-剪结构框架地震内力的实用确定方法[J].建筑结构,1997,27(10):17―20.Liu Jianxin.Determination of story seismic internal forces of the frame in high rise frame-shear wall structures with consideration of stiffness degradation of walls[J].Building Structure,1997,27(10):17―20.(in Chinese)
    [8]郭健,何益斌,郦世平,周海兵,田雁新.基于刚度退化的框架结构受力性能研究[J].湖南大学学报(自然科学版),2007,34(5):20―23.Guo Jian,He Yibin,Li Shiping,Zhou Haibing,Tian Yanxin.Research on the behaviors of frame structures based on stiffness degradation[J].Journal of Hunan University(Natural Sciences),2007,34(5):20―23.(in Chinese)
    [9]孙金墀,关启勋.钢筋混凝土有边框柱剪力墙的强度与变形性能[J].建筑结构学报,1988,9(6):17―29.Sun Jinchi,Guan Qixun.Experimental research on strength and deformability of reinforced concrete framed shear wall[J].Journal of Building Structures,1988,9(6):17―29.(in Chinese)
    [10]JagMohan Humar,Mohamed A.Mahgoub.Determination of seismic design forces by equivalent static load method[J].Canadian Journal of Civil Engineering,2003,30(2):287?307.
    [11]方鄂华.高层建筑结构设计[M].第2版.北京:中国建筑工业出版社,2003.Fang Ehua.High-rise building structure design[M].2nd ed.Beijing:China Architecture Industry Press,2003.(in Chinese)

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心