拱坝体型的多目标模糊优化设计
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
在拱坝体型的优化设计中 ,传统的以经济指标为目标函数的数学模型 ,有一定的局限性。本文综合考虑拱坝的安全性与经济性 ,建立了多目标优化设计的数学模型。模型解决了多目标函数及拉应力控制标准的模糊性。小湾拱坝的优化计算结果表明了模型的合理性与可行性
In the arc dams optimization, the used mathematical models with the economic norms as their objective function have some extents of limitations. For the sake of comprehensive, safety and economy, a new multi\|objective optimization model is established. In this model, the fuzziness of multi\|objective function and the tension stress control criterion are all solved. The computation results for Xiao wanae dam demonstrate the model to be reasonable and feasible.
引文
[1] 陈厚群,侯顺载,李德玉.拱坝动力分析方法的探讨[J].水利学报,1988,(7):64-69.(ChenHouqun,HouShunzai,LiDeyu.Study on dynamic analysismethod of arch dam[J].Journal ofHydraulicEngineering,1988,(7):64-69.(inChinese))
    [2] 谢能刚.高地震区高拱坝体型的多目标动力优化设计方法的研究[D].南京:河海大学,1999.(XieNenggang.Multi-objective dynamic optimum designfor shape of high arch dam in high seismic region[D].Nanjing:HohaiUniversity,1999.(inChinese))
    [3] 宋海平,周传荣.模糊环境下多目标结构动力优化设计[J].应用力学学报,1998,15(3):139-142.(SongHaiping,ZhouChuanrong.Structural multiobjec-tive dynamic optimization in a fuzzy enviroment[J].ChineseJournal ofAppliedMechanics,1998,15(3):139-142.(inChinese))
    [4] 陈鸣钊,张志烈,樊宝康.模糊数学及其应用[M].南京:河海大学出版社,1992.(ChenMingzhao,ZhangZhilie,FanBaokang.FuzzyMathematicsanditsApplications[M].Nanjing:HehaiUniversityPress,1992

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心