摘要
文章在对HSP声波反射法的工作原理、仪器设备及测试分析软件介绍的基础上,结合SZ隧道出口段掌子面的实际地质条件,对其出口左右线掌子面进行测试分析,并得到施工开挖验证。应用HSP声波反射法对隧道掌子面前方地质条件进行及时准确的预测,提前采取预防措施,避免灾害的发生,或在—定程度上减少因灾害造成的损失,减少施工过程的干扰,对隧道的安全施工具有积极的指导作用,值得在同类隧道施工地质预报中推广应用。
Based on the introduction of working principles,instrument,equipment and analysis software of the Horizontal Sound Probing method and considering the geological conditions of the area involved,authors of the paper tested and analyzed the SZ tunnel face on exit section,the results were verified by excavation.Application of HSP to timely and accurately forecast geological conditions in front of the tunnel face helps to take preventive measures to avoid disasters or to reduce the losses caused by disasters,which can guide the safety tunnel construction and would be worthy of disseminating and applying for similar tunnel geological forecasting.
引文
[1]何发亮,李苍松.隧道施工期地质超前预报技术的发展[J].现代隧道技术,2001,38(3):12~14He Faliang,Li Cangsong.The Development of Geological Forecast in Tunnel Construction[J].Modern Tunnelling Technology,2001,38(3):12~14
    [2]何发亮、李苍松、陈成宗.隧道地质超前预报[M].西南交通大学出版社,2006,1~3He Faliang,Li Cangsong,Chen Chengzong.Geological Forecast on Tunnelling[M].Southwest Jiaotong University Press,2006,1~3
    [3]曾昭璜.隧道地震反射法超前预报[J].地球物理学报,1994,37(2):267~271Zeng Zhaoyu.Advanced Prediction with Seismic Reflection Method in Tunnelling[J].Chinese Journal of Geophysics,1994,37(2):267~271
    [4]丁恩保.隧道工程地质预报方法探讨[J].工程地质学报,1995,3(1):28~34Ding En'bao.Discussion on Geological Forecast Method Used in Tunnel Engineering[J].Journal of Engineering Geology,1995,3(1):28~34
    [5]陈成宗,何发亮.隧道工程地质与声波探测技术(第一版)[M].西南交通大学出版社,2005,158~159Chen Chengzong,He Faliang.Tunnel Engineering Geology and Acoustic Detection Technology(The First Edition)[M].SouthwestJiaotong University Press,2005,158~159