摘要
文章建立了桩土模型,把桩身当作Bernoulli-Euler梁,桩周土当作Winkler地基,研究桩顶受到横向冲击荷载时桩的瞬态横向动力响应;应用有限差分法得到桩身各点响应的数值解;分析桩长、桩周土剪切波速和桩顶横向激振力作用时间对桩的瞬态横向动力响应的影响。
This paper establishes the pile-soil model,in which the pile is assumed to be a Bernoulli-Euler beam of finite length,and the soil around the pile is treated as Winkler foundation.The transient lateral response of the pile subjected to the lateral impulse load at the pile head is studied.The response of each point of the pile is obtained using the finite difference method.The effects of the pile length,the velocity of shear wave of the soil and the duration of the lateral impulse load at the pile head on the transient lateral dynamic response are investigated.
引文
[1]赵振东,杉木三千雄,铃木善雄.桩基低应变完整性检测的分析研究[J].地震工程与工程振动,1995,15(4):104-112.
    [2]徐攸在,刘兴满.桩基动测新技术[M].北京:中国建筑工业出版社,2002:14-25.
    [3]刘东甲.不均匀土中多缺陷桩的轴向动力响应[J].岩土工程学报,2000,22(4):391-395.
    [4]钱家欢,殷宗泽.土工原理与计算[M].第2版.北京:中国水利水电出版社,1996:45-53.
    [5]JGJ/T 93-95,基桩低应变动力检测规程[S].
    [6]倪振华.振动力学[M].西安:西安交通大学出版社,1994:85-93.
    [7]刘东甲,王建国.瞬态横向振动桩的Winkler参数[J].岩土工程学报,2003,25(6):922-926.
    [8]刘东甲.纵向振动桩侧壁切应力频率域解及其应用[J].岩土工程学报,2001,23(5):544-546.
    [9]刘东甲,王建国.均匀土中有限长桩瞬态横向动力响应[J].工程力学,2003,20(6):160-165.
    [10]徐芝纶.弹性力学简明教程[M].第3版.北京:高等教育出版社,2003:83-85.