震后临时安置住房的现状和思考
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
在对汶川地震灾区临时安置区进行大量调查的基础上,分析了灾后临时住房在规划和建筑设计中存在的问题,并提出了灾后临时安置住房规划和建筑设计新的思考,在城市临时避难安置地增设管线出入口,制定灾后安置区规划设计规范,研究新建筑技术,做到可持续发展。
Based on investigating a number of Wenchuan earthquake-stricken area of temporary shelters, analysis of post-disaster temporary housing in the planning and architectural design problems, and put over present situation and thinking of temporary housing after earthquake, to add import and export pipelines on temporary refuge in urban settlements, to establish planning and design specification of post-disaster resettlement area, to study of new construction techniques, achieve sustainable development.
引文
1Cassidy.J.Impacts of prefabricated temporary housing after disasters:1999earthquakes in Turkey.Habitat International.2007.Volume31.Issue1.Pages36-52.
    2Quarantelli.E.L.Patterns of shelter and housing in US disasters.Disaster Prevention and Management.1995.Volume4.No3.Pages43-53.
    3Comerio.M.Disaster Hits Home:New policy for Urban Housing Recovery.University of California Press.1998.Berkeley.
    4国务院.《汶川地震灾后恢复重建条例》[EB/OL].http://www.gov.cn/zwgk/2008-06/09/content_1010710.htm..2008-06-09.
    5住房和城乡建设部.《地震灾区过渡安置房建设技术导则(试行)》[EB/OL].http://www.mohurd.gov.cn/zcfg/jswj/jskj/200805/P020080522583129374295.doc.2008-5-22.
    6宋海瑜.汶川地震灾后重建中的13个主要风险[EB/OL].http://tjsonghaiyu.blog.163.com/blog/static/379458092008639453833.2008-07-03.
    7王戈.国际竹藤网络中心将为四川地震灾区捐赠一批竹质抗震预制板房[EB/OL].http://www.icbr.ac.cn/Article/ShowArticle.asp·ArticleID=5731.2008-5-27.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心