冻结工程项目管控研究
详细信息    本馆镜像全文|  推荐本文 |  |   获取CNKI官网全文
摘要
矿井冻结法凿井工程施工在煤炭资源开采掘进中占有重要地位,虽已达到国际先进水平,但在冻结工程管理研究方面比较薄弱。本文针对工程管理的技术参数优化管控问题开展研究,首先确定了冻结工程管控的目标函数,运用工程管理理论,分析确定了影响冻结工程成本、质量、工期管理方法的主要因素。其次,运用赢得值法、全面质量管理、横道图和双代号网络图法提出冻结工程成本、质量、工期的管理方法,对影响各要素的技术参数运用六西格玛质量管理、灰色系统理论进行优化,达到减少成本、提高质量、缩短工期的工程目标。最后做冻结工程实证分析,计算得出以成本、质量、工期作为不同权重下的冻结工程技术参数取值。本文提出了冻结工程施工管控方面理论研究方法以及提高冻结工程管控水平的方法,这在扩大企业经济效益方面具有重要的作用。
China is a country with abundant coal resources and scarce petroleum resources.The coal resource which is regarded as the main developed energy source is widelyused in various industry fields, and the coal resource is the pillar of the economy ofChina. Although the mine freezing method of sinking operation has reached theinternational advanced level, the study of the management of the freezing engineeringis still relatively weak according to the current situation. In the first place, this paperaims to explore the management methods of freezing shaft sinking method and it alsoanalyses the main factors which influence the cost, quality and management methodsof the freezing project duration by using the engineering management theory. In thesecond place, this paper uses the EVM(earned value management), TQM(total qualitymanagement), bar graph and Activity-On-Arrow method which are based on theengineering management approach to provide the methods of cost, quality control andthe project schedule management of the freezing engineering. This paper also uses SixSigma management and grey system theory which are based on the engineeringtechnical methods to optimize the technical parameters and achieve engineering goalsof developing qualities, reducing costs and shorten the time limit of projects. Last butnot least, this paper uses one technical parameter as an example to give the positiveanalysis in order to calculate the parameter results of the freezing engineering underdifferent weighting function including costs, quality and project duration. This paperprovides the basic theoretical research methods of the construction control of freezingengineering and this is very important and meaningful for the development of themanageable level of the freezing engineering and the expansion of the economicinterests and benefits of enterprises in China.
引文
1.宋雷,王伟著复杂条件下的冻结井筒施工成套技术2010M中国矿业大学出版社2010.11:1
    2.金磊顾章川冻结法施工旁通道地段铺轨过度施工管理城市轨道交通研究J2012,15(1)
    3.刘文民程志彬张步俊深厚冲积层冻结井筒防冻结管断裂技术能源技术与管理2011.(4)
    4.褚继东冻结项目部管理制度探讨2005全国狂删建设学术会议论文集(下册)2006.1.16
    5.王宗金陈蛮庄风井冻结方案设计优化西部探矿工程J2010,22(8)
    6.汪人和张瑞对多圈管冻结方案优化设计的探讨矿山建设工程新进展--2006全国矿山建设学术会议文集[J]2006.8
    7.林志、胡向东盾构法隧道冻结法强度验算[J]公路交通技术2007(3)
    8.胡宝铜,邵学敏,李绪强胡家河矿副立井井筒冻结法施工技术研究山西煤炭[J]2010,29(4)
    9.朱翔斌金其浩利用冻土扩展速度进行三圈管冻结方案设计山西建筑[J]2010,36(23)
    10.郝学军曾涛构建成本管控体系、强化企业集团竞争力[J]生产力研究2010.(1)
    11.周建功马国红张雷成本管控信息系统在煤矿企业的应用[J]中州煤炭2011.(10)
    12.李世群靳凤兰论全面预算管理的实施与成本管控当代经济[J]2011.(14)
    13.封磊企业如何进行管控河北企业[J]2011,(9)
    14.张凤锟工程项目成本管控对策研究时代经贸[J]2012,(35)
    15.李卫云煤炭企业集团成本管理控制探讨时代报告(学术版)[J]2012,(8)
    16.包叶飞论加强企业成本管控的路径与策略中国市场[J]2012,(36)
    17.周景兰施工单位成本管理存在问题探析价值工程[J]2012,31(9)
    18.麻改英煤炭企业全过程成本管理会计之友[J]2010,(21)
    19.刘海生战略成本管理研究会计之友[J]2009,(3)
    20. Dr. Jürgen Bode. Neural networks for cost estimation. Cost Engineering,1998,40(l):25-30
    21. Lin P C,Sue L Y.Application of Optimal Control Theory to Product Pricing and Warrantywith Free Replacement under the Influence of Basic Lifetime Distributions.Computers&Industrial Engineering,2005,48(1):69-82
    22. Liu Z J,Chen W,Huang H Z.A Diagnostics Design Decision Model for Products underWarranty.International Journal of Production Economics,2007,109(I-21:230-240
    23. Y. Asiedu;R. W. Besant Simulation-based cost estimation under economic uncertaintyusing kernel estimators International Journal of Production Research2001,38(9)
    24. PINA ALVARO MANUEL ST AUBYN,MIGUEL Comparing macroeconomic returns onhuman and public capital: An empirical analysis of the Portuguese case(1960-2001)[J]2005(5)
    25.郭春明申亚楠基于作业成本法的参数成本评估科研管理[J]2007,28(2)
    26.王帅王庆明面向成本的单机多工件调度中加工参数的选择华东理工大学学报(自然科学版)[J]2008,34(6)
    27.姚姗姗基于效能概念的成本参数估算模型的改进计算机工程与应用[J]2010,46(16)
    28.赵会风挣值理论在工程项目控制中的应用科技风[J]2009(14)
    29.李先柏C-D生产函数、成本、要素用量及参数估计北京理工大学学报(社会科学版)[J]2008,10(6)
    30.邢作霞姚兴佳陈雷李科郑琼林基于成本模型法的1MW变速风电机组的参数优化设计分析太阳能学报[J]2007,28(5)
    31.李慧基于保成本设计的参数不确定性表示的优化计算机仿真[J]2008,25(6)
    32.侯瑜基于DQAF框架的我国统计数据质量管理及改进[J]统计研究2012,29(12)
    33.黄向阳张皓多学科视角下的统计数据质量管理[J]商业经济与管理2011(9)
    34. Rui Zou Wu-Seng Lung Jing Wu Multiple-pattern parameter identification and uncertaintyanalysis approach for water quality modeling Ecological Modeling [J]2009,220(5)
    35.王丽颖杨志刚王秀伦工艺数字化系统中的工序质量管理计算机集成制造系统[J]2003,9(6)
    36.王秋明高慧颖刘科成基于过程方法的现代集成制造模式下质量管理系统模型中国科学院研究生学报[J]2012,29(5)
    37.李明树王青基于过程控制的软件质量管理电子学报[J]2002,30(z1)
    38.唐仁春杨振宇高校教育质量管理中的博弈分析系统工程[J]2006,24(11)
    39.彭武良卢睿王成恩面向过程的产品开发项目质量管理计算机工程[J]2008,34(10)
    40. TAN Ai-hong XU Chang-wu The Design of Quality Control Module for the ERP System ofSmall and Medium-sized Enterprises MODERN MANUFACTURING ENGINEERING [J]2009,(12)
    41.苏庆峰论工程施工质量管理价值工程[J]2012,31(35)
    42.吴军邓超邵新宇游本善面向PLM的协同质量管理系统华中科技大学学报(自然科学版)[J]2006,34(6)
    43. F.-C. WU Sequential optimization of parameter and tolerance design for multiple dynamicquality characteristics International Journal of Production Research [J]2007,45(13)
    44. Pisvimol Chatsirirungruang Application of genetic algorithm and Taguchi method indynamic robust parameter design for unknown problems The International Journal ofAdvanced Manufacturing Technology [J]2010,47(9/12)
    45. Reynolds, W. D. Drury, C. F. Yang, X. M. Tan, C. S. Optimal soil physical quality inferredthrough structural regression and parameter interactions Gendarma [J]2008,146(3/4)
    46. Poschet, F Bernaerts, K Geeraerd, AH Scheerlinck, N Nicolai, BM Van Impe, JFSensitivity analysis of microbial growth parameter distributions with respect to data qualityand quantity by using Monte Carlo analysis Mathematics and Computers in Simulation [J]2004,65(3)
    47.胡庆武李清泉多分辨率影像质量参数评定影像质量的方法中国图象图形学报[J]2011,16(3):474-479
    48.唐进元卢延峰周超调整参数误差对齿面接触质量的影响航空动力学报[J]200809-1718-06
    49.王振端刘建军改进钻爆参数提高隧道围岩开挖质量内蒙古公路与运输[J]201102-0011-03
    50.戴虹易跃华黄建平周世恒新型气压焊轨机参数采集与质量管理信息系统电焊机[J]200901-0083-03
    51.童应学环件轧制参数与质量关系研究制造技术研究[J]2010-10-5
    52.黄海徐守军胶济客运专线道床质量状态参数试验研究铁道科学与工程学报[J]2009-08-06-04
    53.韩梅沙作良伍倩张念王铁峰王金福双探针电导探头测量气泡参数的信号质量过程工程学报(2009)02-0222-06
    54.陈霁丰供应链环境下供求双方面临的约束参数对产品质量的影响安徽农业科学[J].2008,36(4):1718-1720
    55.高继伟李大勇董静薇石德全一种新型湿型砂质量综合评定系统的研究开发研究[J](2006)02-4
    56.王爱平调整工艺参数提高实物质量SCIENCE&TECHNOLOGY INFORMATION [J]2008,(14)
    57.王前洪张宇杨慕升面向质量不合格率的CUSUM控制图参数优化设计山东理工大学学报(自然科学版)(2006)03-0051-05
    58.杨振和苏振华杨卓齿轮轴承结构参数优化设计食品与机械2011.02.025
    59.康艳丽工程项目施工阶段进度管理与控制研究城市建设理论研究[J]2012,(27)
    60.甄志禄艾红梅基于系统论的建设工程紧缩工期管理研究施工技术[J]2012,41(16)
    61. Pierre Bonnal,Didier Gourc and Germain Lacoste.Where do we stand with fuzzy projectscheduling.Journal of Construction Engineering and Management [J].2004.130(1):
    114.123
    62. Adriana V.Ordonez Oliveros,Aminah Robinson Fayek.Fuzzy Logic Approach for ActivityDelay Analysis and Schedule Updating[J].Journal of Construction Engineering andManagement.2005.131(1):42-51
    63. Abdulaziz A.Bubshait,Michael J.Cunningham.Comparison of Delay Analysis Method[J] Journal of Construction Engineering and Management.1998,l(4):315-322
    64.曾志辉曹奇优化模糊控制方法在工程成本工期管理中的应用研究建筑施工[J]2005,27(6)
    65.芮秀华结合工期与成本的工程管理优化方法分析城市建设[J]2012,(17)
    66.陈松石范春菊崔新奇邰能灵基于Matra位差算法的电站自动化改造模型与进度控制研究电力系统保护与控制[J]2010,38(22)
    67.左敏浅谈EPC项目的计划管理与进度控制钻采工艺[J]2011,34(6)
    68.单汩源汪玉吴娟彭丹妮MC企业多项目进度控制研究湖南大学学报(社会科学版)[J]2008,22(2)
    69. E. D. Talbi L. Geneste B. Grabot Application of optimization techniques to parameterset-up in scheduling Computers in Industry [J]2004,55(2)
    70. Grzegorz Dudek Adaptive simulated annealing schedule to the unit commitment problemElectric Power Systems Research [J]2010,80(4)
    71.刘煜明.基于一定风险水平的施工进度计划研究[J].河海大学学报.2006.34(2):227.230
    72.李岚基于网络图时间参数UTM算法的施工项目资源优化MATHEMATICS INPRACTICE AND THEORY [J]2008,38(9)
    73. QI Shen-jun ZHANG Yun-bo DING Lie-yun Forecast Model of Activity DurationBased on LS-SVM in Construction Engineering Project JOURNAL OF HUAQIAOUNIVERSITY(NATURAL SCIENCE)[J]2010,31(5)
    74.孙锐陈建伟塑料排水板在深厚软土地基的应用与设计市政技术[J]2010,28(2)
    75.王新征基于工期奖罚制度的挣值法的改进及应用山西建筑[J]2009,35(33)
    76.方良平姜炜无节奏流水施工方法在施工顺序优选中的应用山西建筑[J]2008,34(14)
    77.韩文民马士凤大型制造业分权管理模式进化博弈分析科学技术与工程[J]2011,11(2)
    78.吴文平钟笑萍马斌模糊网络计划技术在水利工程施工中的应用研究西安理工大学学报[J]2006,22(3)
    79.郭德强水库大坝基础固结灌浆补强加固施工技术城市建设理论研究[J]2011,(16)
    80.王剑涵洞基坑降水方案比选与参数分析现代城市轨道交通[J]2009,(5)
    81.地层冻结工法理论研究与实践陈湘生等2007.03M
    82.石川馨质量管理入门机械工业出版社1979
    83.新编工业企业管理刘登辉主编2006年2月兰州大学出版社M
    84.高效管理的N种工具金鑫主编2007年7月第一版中国纺织出版社
    85.基于六西格玛的质量管理系统2003年硕士论文西安工程科技学院裘幼梓
    86.建筑工程施工项目成本管理唐菁菁编著2009年09月机械工业出版社
    87.工程项目管理陆惠民等编2002年09月1版东南大学出版社
    88.对工程项目管理赢得值分析法的改进钟冬梅余晓钟化工技术经济2005年3月第23卷第3期J
    89.张红敏《论全面质量管理与质量管理体系标准的关系》P29-31《石油工业技术监督》2009年9月
    90.《工程管理总论》谭章禄李涵徐向真P194-195
    91.谭元戎孙剑平基于德尔菲法的营销人员能力成熟度评价指标体系构建[J]经济问题探索2012年第四期
    92.六西格玛管理研究-以K公司为例吴钦2009年3月首都经贸大学硕士论文企业管理
    93.六西格玛管理在A公司的质量管理系统中的应用研究黄煜华20090901苏州大学硕士论文工商管理专业
    94. Zhiyu Chen,Chan Liu. The Application According to the DMAIC Model Based on the "6σ"Method in the Hotel Management. The3nd International Conference on InformationScience and Engineering.2011,9
    95.六西格玛项目管理技术研究及应用系统开发李平重庆大学硕士论文机械制造及其自动化2007年05月
    96.灰色系统理论及其应用刘思峰著2010.01415页M
    97.灰色预测与决策模型研究2009.12党耀国M
    98.基于灰色系统理论的工期偏差预测分析薛卓华张坤水利电力科技2009-3-35-1
    99.灰色预测与决策邓聚龙1986年06月华中理工大学出版社325页M
    100.灰色理论与方法-提要题解程序应用易德生1992年01月石油工业出版社M
    101.谭元戎孙剑平基于德尔菲法的营销人员能力成熟度评价指标体系构建[J]经济问题探索2012年第四期
    102.邓聚龙灰色系统基本方法M华中科技大学出版社,2005
    103.刘思峰,党耀国,方志耕.灰色系统理论及其应用[M].北京:科学出版社.2004.
    104.工程项目进度管理方法与应用研究博士论文,天津大学管理科学与工程褚春超20061101
    105. Devaux Stephen A.全面项目控制项目经理人整合项目规划、评估与跟踪的工作指南[M].张莉译.北京:人民邮电出版社,2004

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700