用户名: 密码: 验证码:
上海浦东国际机场T1候机楼水系统设备评估
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Evaluation of water system of the T1 terminal of Shanghai Pudong International Airport
  • 作者:李伟英 ; 刘志超 ; 迟玉霞 ; 杨居川 ; 陆俊宇
  • 英文作者:Li Weiying1,Liu Zhichao1,Chi Yuxia2,Yang Juchuan2,Lu Junyu3(1.Key Laboratory of Yangtze River Water Environment,Ministry of education,Tongji University, Shanghai 200092,China;2.Shanghai Municipal Engineering Design and Research Institute(Group)Co.,Ltd., Shanghai 200092,China;3.Pudong International Airport Co.,Ltd.,Shanghai,201202,China)
  • 关键词:给水系统 ; 热水系统 ; 排水系统 ; 设备评估 ; 候机楼 ; 2010上海世博会
  • 英文关键词:Water supply system;Hot water supply system;Water drainage system;Equipment evaluation;Terminal;2010 Shanghai EXPO
  • 中文刊名:JZJS
  • 英文刊名:Water & Wastewater Engineering
  • 机构:同济大学长江水环境教育部重点实验室;上海市政工程设计研究总院(集团)有限公司;浦东国际机场股份有限公司;
  • 出版日期:2013-02-10
  • 出版单位:给水排水
  • 年:2013
  • 期:v.49;No.373
  • 基金:上海国际机场股份有限公司科技专项(2010237127);; 上海浦东威立雅有限公司科研项目(20122450270)
  • 语种:中文;
  • 页:JZJS201302028
  • 页数:6
  • CN:02
  • ISSN:11-4972/TU
  • 分类号:113-118
摘要
水系统在上海浦东国际机场T1候机楼能源保障系统中具有极为重要的作用。为保证2010年上海世博会期间T1候机楼水系统设备的正常运行,结合现场调研对T1候机楼水系统进行了评估,重点研究了T1候机楼水系统的组成、设备的特性、运行状况及运载能力;通过与原始设计资料进行对比与分析,探讨系统运行状况是否满足设计要求、现状要求和未来需求。与此同时,评估主要设备使用寿命,阐述设备系统存在的不足与缺陷,为浦东机场T1候机楼水系统设备未来的维护、更新及改造提供参考。
        Water system plays crucial role in the energy guarantee system for the T1 terminal of Shanghai Pudong International Airport.In order to ensure the operation of the water system of the T1 terminal during the 2010 Shanghai Expo,the water system was evaluated.This evaluation focused on the composition of the water system and the characteristics,current operation situation,and loading capacity of the equipments;through the comparison between original design and current situation,this evaluation also discussed whether the current system could meet the design requirement,current requirement,and future task.This evaluation mainly tested the lifetime and explained the existing deficiencies of the equipments.This paper would provide references to the maintenance,upgrading,and reconstruction of the Pudong Interntaional Airport T1 terminal in the future.
引文
1罗琳.浦东国际机场扩建工程供水规划及分阶段实施研究.中国市政工程2005,(4):52~53
    2GB5479—2006生活饮用水卫生标准
    3鲁雪利.二次供水水质存在的问题及解决方法.兰州工业高等专科学校学报.2005,(3):30~31
    4GB10068—2008电机振动标准
    5ISO3740声学标准

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700