水系统在上海浦东国际机场T1候机楼能源保障系统中具有极为重要的作用。为保证2010年上海世博会期间T1候机楼水系统设备的正常运行,结合现场调研对T1候机楼水系统进行了评估,重点研究了T1候机楼水系统的组成、设备的特性、运行状况及运载能力;通过与原始设计资料进行对比与分析,探讨系统运行状况是否满足设计要求、现状要求和未来需求。与此同时,评估主要设备使用寿命,阐述设备系统存在的不足与缺陷,为浦东机场T1候机楼水系统设备未来的维护、更新及改造提供参考。
Water system plays crucial role in the energy guarantee system for the T1 terminal of Shanghai Pudong International Airport.In order to ensure the operation of the water system of the T1 terminal during the 2010 Shanghai Expo,the water system was evaluated.This evaluation focused on the composition of the water system and the characteristics,current operation situation,and loading capacity of the equipments;through the comparison between original design and current situation,this evaluation also discussed whether the current system could meet the design requirement,current requirement,and future task.This evaluation mainly tested the lifetime and explained the existing deficiencies of the equipments.This paper would provide references to the maintenance,upgrading,and reconstruction of the Pudong Interntaional Airport T1 terminal in the future.
引文
1罗琳.浦东国际机场扩建工程供水规划及分阶段实施研究.中国市政工程2005,(4):52~53
2GB5479—2006生活饮用水卫生标准
3鲁雪利.二次供水水质存在的问题及解决方法.兰州工业高等专科学校学报.2005,(3):30~31
4GB10068—2008电机振动标准
5ISO3740声学标准