摘要
以北京大兴国际机场航站楼核心区工程为背景,综合考虑基础桩概况,对比常规施工工艺与静载检测桩及桩头加固一体化施工技术。实践证明,静载检测桩及桩头加固一体化施工技术可在保证满足检测要求的前提下,有效减少施工工序,缩短施工周期,具有较好的经济效果和应用价值。
Based on the core area project of Beijing Daxing International Airport Terminal Building,considering the general situation of foundation piles, the integrated construction technology of conventional construction technology,static load testing pile and pile head reinforcement is compared.Practice proves that the integrated construction technology of static load testing pile and pile head reinforcement can effectively reduce the construction process and shorten the construction period,and has better economic effect and application value on the premise of meeting the detection requirements.
引文
[1]建筑地基基础设计规范:GB 50007—2011[S].北京:中国计划出版社,2012.
[2]中国建筑科学研究院.建筑基桩检测技术规范:JGJ 106—2014[S].北京:中国建筑工业出版社,2014.
[3]上海市基础工程公司.建筑地基基础工程施工质量验收规范:GB 50202—2002[S].北京:中国计划出版社,2002.
[4]程绪楷.建筑施工技术[M].北京:化学工业出版社,2005.
[5]宁仁岐.建筑施工技术[M].北京:高等教育出版社,2002.
[6]张琨,许立山,刘创,等.中国尊大厦超深基坑后注浆钻孔灌注桩施工技术[J].施工技术,2019,48(4):1-4.
[7]汪一鸣.切削式钻孔灌注桩实际应用与研究[J].施工技术,2018,47(13):29-31.
[8]王一凡,罗丁,李智轩,等.旋挖干成孔灌注桩基础综合施工技术[J].施工技术,2018,47(11):78-82.
[9]施群凯,丁丽祯,陶荣江,等.深厚淤泥质土层大长径比超深灌注桩施工技术[J].施工技术,2018,47(7):84-87.