摘要
从概念发展、标准规范与立法、评价与标识认证3个方面,简要介绍了美国零能耗建筑的发展现状。以西雅图布利特中心为例,详细介绍了零能耗建筑建设过程中所采用的节能技术及运营效果,以期对我国零能耗建筑发展有所启示。
From the three aspects of concept development, standardization and legislation, evaluation and identification certification, presents briefly the development status of zero energy buildings in the United States. Taking the Seattle Bullitt Center as an example, presents the energy saving technologies adopted in the construction of zero energy buildings and the operation effects in detail, with a view to enlightening the development of zero energy buildings in China.
引文
[1] DOE.DOE annual energy outlook 2015[EB/OL].(2015-04-14).[2017-10-29].https://www.eia.gov/outlooks/archive/aeo15
[2] TORCELLINI P,PLESS S,DERU M,et al.Zero energy buildings:a critical look at the definition[C/CD]//2006 ACEEE Summer Study on Energy Efficiency in Buildings,2006
[3] National Renewable Energy Laboratory.Net-zero energy buildings:a classification system based on renewable energy supply options[EB/OL].(2010-06-01).[2017-10-29].https://www.nrel.gov/sustainable_nrel/pdfs/44586.pdf
[4] 汤姆·胡特曼.净零能源设计:商业架构指南[M].王浩然,吴巍,译.北京:电子工业出版社,2016:10- 12
[5] The National Institute of Building Sciences.A common definition for zero energy buildings[EB/OL].(2015-09-26).[2017-10-29].https://www.energy.gov/sites/prod/files/2015/09/f26/bto_common_definition_zero_energy_buildings_093015.pdf
[6] 张时聪.“零能耗建筑”定义发展历程及内涵研究[J].建筑科学,2013,29(10):114- 120
[7] United States Department of Energy.Saving energy and money with building energy codes in the United States[EB/OL].(2014-05-15).[2017-10-29].http://energy.gov/sites/prod/files/2014/05/f15/saving_with_building_energy_codes.pdf
[8] The White House Office of the Press Secretary.Planning for federal sustainability in the next decade[EB/OL].(2015-03-19).[2017-12-23].https://obamawhitehouse.archives.gov/the-press-office/2015/03/19/executive-order-planning-federal-sustainability-next-decade
[9] United States Congress.Energy security and independence act 2007 [EB/OL].(2013-06-01).[2017-12-23].http://www.gpo.gov/fdsys/pkg/BILLS-110hr6enr/pdf/BILIS-110hr6enr.pdf
[10] United States Department of Energy.Building technologies program,planned program activities for 2008-2012[EB/OL].(2013-06-01).[2017-12-23].http://appsl.eere.engry.gov/buildings/publications/pdfs/corporate/myp08complete.pdf
[11] New Buildings Institute.2018 getting to zero status update[EB/OL].[2018-01-23].https://newbuildings.org/wp-content/uploads/2018/01/2018_GtZStatusUpdate_201808.pdf
[12] PE?A R B.Living proof—the Bullitt Center [EB/OL].[2015-08-06].http://203.187.160.132:9011/www.bullittcenter.org/c3pr90ntc0td/wp-content/uploads/2015/08/living-proof-bullitt-center-case-study.pdf