摘要
环保电站垃圾池施工难度大、防渗要求较高,是工程建设的重点环节。本文结合花溪、仁怀环保电站工程建设的管理经验,对环保电站垃圾池的防渗设计、防裂设计、施工工艺措施和质量控制措施等方面进行综合分析,以期为相似环保电站建设管理提供参考。
Environmental protection power station garbage pond construction is difficult and requires high seepage control, which is the key link of engineering construction. Based on the management experience in the construction of Huaxi and Renhuai environmental protection power stations, this paper makes a comprehensive analysis on the anti-seepage design, anti-crack design, construction technology measures and quality control measures of the waste pool of environmental protection power stations, so as to provide reference for the construction and management of similar environmental protection power stations.
引文