摘要
我国电气化铁路接触网关键零部件多采用M8-M20规格螺栓进行连接,其数量较多且安装于线路上方,如果螺母松动将影响铁路供电安全和行车安全,为此本文对高速铁路接触网低频振动及零部件的防松策略进行分析。
The bolts with specifications of M8-M20 are commonly used for connection of key fittings of OCS for electrified railway in China, they are huge in amount and installed above the railway line, the railway power supply safety and train running safety will be impacted once there is any loosening of bolts; therefore, the paper analyzes the low frequency vibration of OCS and measures for anti-loosening of fittings for high speed railways.
引文
[1]马红强.现代铁路接触网低频振动及零部件防松技术研究[J].工程技术(文摘版),2016(7):257-257.
[2]刘长利.高速铁路接触网低频振动分析及零部件防松技术探讨[C].高速铁路接触网零部件安全可靠性技术论文集,2013.
[3]范福元.浅谈国内外铁路接触网零部件防松措施[J].城市建设理论研究:电子版,2013(32).
[4]刘长利,段立新.国内外高速铁路接触网零部件防松安全技术分析[C].2012中国铁路电气化技术装备交流大会及产品展示会,2012.
[5]胡贤君,逄格华,李明亮.高速铁路接触网低频振动及零部件防松技术分析[J].工程技术(文摘版),2016(9):230-230.
[6]王飞.浅谈高速铁路接触网零部件防松措施的应用[J].赤子(上中旬),2014(17):247-247.
[7]李永生,李军杰,闫军芳.浅谈高速铁路接触网零部件防松措施的应用[C].高速铁路接触网零部件安全可靠性技术论文集,2013:120-123.
[8]李科.基于ABAQUS的接触网腕臂结构及其关键零部件分析与优化[D].西南交通大学,2017.
[9]许建国,李忠齐,张志刚.高速接触网紧固件防松措施差异性技术研究[J].电气化铁道,2017,28(6):25-29.