摘要
项目三同时管理是项目建设过程时的一项重点工作内容,在国内工程项目建设中的地位日益明显。基于项目全过程中需完成的工作,描述项目过程管理中遇到的前期手续问题,就工程项目三同时管理存在问题进行分析,同时结合从事工程项目三同时管理实践经验提出相应建议,对工程项目管理具有一定的指导意义。
Based on the theory of porous media heat transfer,submarine soil moisture-heat coupling equation is established.The influence of sea water temperature and seepage flow rate on the hot oil pipeline unsteady heat transfer is analyzed,the results show that:the relatively greater the sesed.The whole-process project management is increasingly important in the current engineering project.Based on the project work,which include the prophase management,the construction process,construction and other jobs after start operation,etc.the paper describes the establishment procedures of prophase management in the process.It analyzes the three elements of the projet,which is the progress,the cost,and the project quality.Also It gives some corresponding suggestions for the projcet and the emphasis points for attention after start operation.Meanwhile,combining with the experience in engineering project management,the paper has a certain guiding significance to the engineering project management in the project cycle.
引文
[1]王贤山,韩其利,李宁.工程项目中的全过程管理探讨[J].科技展望,2016,26(11):196-197.
[2]黄福升.浅谈危险化学品建设项目HSE“三同时”管理[J].能源与环境,2012(3):15-17.
[3]宋智慧.简政放权加强“三同时”监督管理---解读《建设项目职业病防护设施“三同时”监督管理办法》[J].湖南安全与防灾,2017(6):22-23.
[4]山东省人民政府办公厅.关于印发山东省工程建设项目审批制度改革行动方案的通知鲁政办字[2018]184号.[OB/].http://www.shandong.gov.cn/art/2018/9/28/art_2259_28646.html.