针对输电线路巡视作业直升机海拔2500米及以上作业时,高海拔特殊自然因素对直升机的影响因素,结合机巡作业特点,研究分析了机型及机载设备选型要求,提出了满足高海拔、相对海拔高差大条件下机巡作业设备选型参数及适用范围。
In view of the influence of special natural factors at high altitude on helicopters with the transmission line inspection operations at an altitude of 2500 meters and above, combined with the operation characteristics of helicopter patrol, this paper analyzes the selection requirements of the helicopter model and airborne equipment, and proposes the selection parameters and the scope of application of patrolling operation equipment to meet the conditions of high altitude and large relative altitude difference.
引文
[1]中国民用航空局标准司,直升机安全运行指南[S],2014.
[2]徐云鹏,毛强,李庭坚.架空输电线路直升机、无人机及地面人工巡视互补机制探讨与研究[J].广西电力,2013,36(5):72-76.
[3]于德明,沈建,汪骏,等.直升机与人工巡视效果对比分析[J].中国电力,2008,41(11):25-28.
[4]裴鑫,香承虎,刘亚巍.直升机在高原地区使用特点分析[C].第二十八届(2012)全国直升机年会论文.
[5]高正.直升机空气动力学的新成果[M].北京:航空工业出版社,1999.
[6]董选昌.直升飞机电力作业现状及应用综述[J].广东电力,2011,24(2):18-24.
[7]伍润,王守礼.碧罗雪山输电线路运行情况评述[J].云南电力技术,2012,40(6):43-45.
[8]金涛,李维鹏,孙斌,等.高原山地直升机巡线作业安全性研究[J].云南电力技术,2016,44(a02):26-26.
[9]陆永,白阳,毛永孝,等.浅析高海拔地区高压架空输电线路机载设备选择及应用[J].工程技术(全文版),2016,22:216-218.
[10]AGAR C.,CARLSON A.The rotary round table:flight safety in high altitude helicopter operations[J].Journal of the American Helicopter Society,1957,2(1):2-3.
[11]MASHMAN J.The real problem of helicopter operations at high altitude[J].Journal of the American Helicopter Society,1957,2(2):3-4.
[12]彭向阳,钱金菊,王柯,等.大型无人直升机多传感器全自动巡检系统及其在500kV线路的应用[J].广东电力,2016,29(4):8-15.
[13]钱金菊,麦晓明,王柯,等.广东电网大型无人直升机电力线路规模化巡检应用及效果[J].广东电力,2016,29(5):124-129.
[14]张文峰,彭向阳,钟清,等.基于遥感的电力线路安全巡检技术现状及展望[J].广东电力,2014,(2):1-6.
[15]DUTT M.High altitude operations:helicopters[J].Indian Journal of Aerospace Medicine,1988,32(1):3-4.
[16]LIU W.D.,DUAN W.Y.,SHEN J.,et al.High altitude helicopter tower hoisting operation technology research[J].Aircraft Design,2013,33(6):64-67.
[17]张柯,李海峰,王伟.浅议直升机作业在我国特高压电网中的应用[J].高电压技术,2006,32(6):45-47.
[18]王慧刚,王峰.输电线路巡视存在问题分析及应对措施[J].现代工业经济和信息化,2014,11:49-53.