摘要
目前我国的矿产勘探技术目前已经达到世界上同等领域的前列乃至领先水平。其中,充填采矿法已经成为了矿产开采开发环节中的基本方法,在开采矿类资源中起着举足轻重的作用。同时充填采矿法是井下采空区治理的关键性措施之一,每次当矿体需要预先开采或上半部分需要开拓运输工程的时候,就需要有一定强度的充填材料对采空区进行充填,降低采空区对上半部分的主要设施以及设备和工程等造成的影响。
With the progress of society and the development of science and technology, China's mineral exploration technology has reached the world's leading level in the same field. Among them, filling mining method has become the basic method in mineral exploitation and plays a decisive role in mining resources. At the same time, filling mining method is one of the key measures to control the goaf. Every time the orebody needs to be pre-mined or the upper part needs to develop transportation engineering, it needs a certain strength of filling materials to fill the goaf, so as to reduce the impact of the main facilities, equipment and engineering of the upper part of the goaf.
引文
[1]蔡仁平,敖丽英.矿山生态环境恢复治理现状和应对措施探讨[J].工程技术:全文版,2016(11):00305-00305.
[2]王树海,李启月,赵国彦.提高充填接顶率的技术措施研究[J].矿冶工程,2011,31(01):13-15+18.