用户名: 密码: 验证码:
高压开关站测控装置遥控失败问题处理
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Failure Problem and Solutions of Measuring and Control Device Remote Control for High Voltage Switching Station
  • 作者:王从伟
  • 英文作者:WANG Congwei;Sanmen Nuclear Power Plant of China National Nuclear Corporation;
  • 关键词:测控装置 ; NCS系统 ; 状态监视 ; 远方遥控
  • 英文关键词:measuring and control device;;NCS system;;status supervise;;remote control
  • 中文刊名:DGJY
  • 英文刊名:Electric Engineering
  • 机构:中核集团三门核电有限公司;
  • 出版日期:2019-05-25
  • 出版单位:电工技术
  • 年:2019
  • 期:No.496
  • 语种:中文;
  • 页:DGJY201910012
  • 页数:3
  • CN:10
  • ISSN:50-1072/TM
  • 分类号:33-34+37
摘要
本文针对某核电厂高压开关站发现的测控装置偶发性遥控失败的问题,进行原因分析,并提出合理的解决方案,为核电厂、火电厂和水电厂500kV或220kV高压开关站测控装置调试和维护提供参考。
        To the randomness failure of remote control of measuring and controlling device in high voltage switching station of a nuclear power plant,the causes were analyzed and the reasonable solutions were put forward to provide reference for commissioning and maintenance of measurement and control devices in 500 kV or 220 kV high voltage switching stations of nuclear power plants,thermal power plants and Hydropower plants.
引文
[1]黄斌.发电厂电气自动化监控系统功能分析[J].科技资讯,2009(14):56.
    [2]李真.变电站自动化系统常见故障及处理[J].电力自动化设备,2010(8).
    [3]张引华.变电站自动化系统现场调试及完善措施[J].供用电,2009,26(3).
    [4]梁木子.220kV级变电站自动化改造面临的系统性问题及对策[J].华东电力,2010(10).

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700