常村煤矿2016年引进北京科技的冲击地压综合监测预警平台,平台整合了矿山已有的几种监测设备,实现其联合监测预警。平台极大提高了分析数据的效率,减少了人工分析数据的工作量,保证了监测数据的及时收集和分析,有利于及时对冲击地压发生做出预警判断,保障矿山安全生产。
In 2016, Changcun Coal Mine introduced the comprehensive monitoring and early warning platform for impact and pressure of Beijing Science and Technology. The platform integrated several existing monitoring equipments of the mine to realize its joint monitoring and early warning. The platform greatly improves the efficiency of analyzing data, reduces the workload of manual analysis of data, and ensures the timely collection and analysis of monitoring data, which is conducive to timely warning of the occurrence of impact pressure and ensuring mine safety production.
引文
[1]齐庆新,窦林明.冲击地压理论与技术[M].中国矿业大学出版社, 2008.
[2]钱鸣高,石平五.矿山压力与岩层控制[M].中国矿业大学出版社, 2003.
[3]刘金海.煤矿冲击地压监测预警技术新进展[J].煤炭科学技术, 2016, 44(6):71-77.
[4]冲击地压综合监测预警平台系统使用手册[M].北京:北京安科兴业科技股份有限公司, 2016.
[5]姜福兴,曲效成,于正兴,等.冲击地压实时监测预警技术及发展趋[J].煤炭科学技术, 2011, 39(2):59-64.
[6]窦林名,李振雷,郭张敏.煤矿冲击地压灾害监测预警技术研究[J].煤炭科学技术, 2016, 44(7):41-46.
[7]鞠文君,潘俊锋.我国煤矿冲击地压监测预警技术的现状与展望[J].煤矿开采, 2012, 17(6):1-5.
[8]刘金海,翟明华,郭信山,等.震动场、应力场联合监测冲击地压的理论与应用[J].煤炭学报, 2014, 39(2):353-363.
[9]宋大川,冲击地压多参量综合监测预警的研究[J].内蒙古煤炭经济, 2017(2):35-36.