摘要
本文以一座新建于广州市的垃圾渗滤液处理站MBR系统为例,介绍了MBR系统调试运行的参数选择及相应的运行效果,通过调试阶段合理调节运行参数,采取相应技术措施,实现了MBR系统的快速启动,达到了预期的效果。本文涉及的参数及方法可为类似工程调试和快速启动提供参考。
Based on a newly built MBR system of garbage leachate treatment station in Guangzhou as an example, this paper introduces the parameter selection and the corresponding operation effect during debugging and running of the MBR system, via reasonable adjusting operational parametersand take appropriate technical measures during debugging stage,realizefast start-up of the MBR system and reach the intended effect, the parameters and methods involved in this paper can provide reference for similar engineer debugging and fast start-up.
引文
[1]陈少明.UASB-MBR-NF-RO工艺在生活垃圾焚烧电厂渗滤液处理中的应用[J].广东化工,2017,44(14):179-180.
[2]任美泽,常亮,杨敏,等.UASB+外置MBR系统+NF+RO工艺处理垃圾发电厂渗滤液[J].水处理技术,2018,44(09):132-134+138.
[3]杜昱,孙月驰,李瑞华,等.垃圾渗滤液MBR处理系统设计要点[J].中国给水排水,2018,34(02):63-67.
[4]李君,杜昱,孙月驰,等.垃圾渗滤液处理的常见问题及解决措施[J].中国给水排水,2010,26(16):138-140.
[5]阎宁,金雪标,张俊清.甲醇与葡萄糖为碳源在反硝化过程中的比较[J].上海师范大学学报(自然科学版),2002(03):41-44.
[6]郑权.铬对活性污泥系统性能及其微生物群落的影响[D].北京化工大学,2018.
[7]唐中亚,邓飞飞,孔为丽,等.垃圾填埋渗滤液生化处理系统中初期菌种污泥培养及驯化研究[J].安徽农学通报,2014,20(13):25-28.