用户名: 密码: 验证码:
Role of Electrical Submerged Pumps in Enabling Asphaltene-Stabilized Emulsions
详细信息    查看全文
文摘
Many oilfield development projects require artificial lift systems, i.e., methods to enhance well fluid production that are needed when the reservoir pressure is too low to allow for the produced fluid to reach the surface. Such an approach is of particular interest for mature oilfields (such as those in the Middle East and North Africa) and for many of the upcoming deepwater and ultra-deepwater fields under development around the world. Artificial lifting can be achieved by gas lifting or through a pump installed into the well. For subsea downhole applications, a progressive cavity pump (PCP) or (centrifugal) electrical submersible pump (ESP) is employed. ESP systems are having, in particular, wide spreading, essentially as a result of the good efficiencies and high rates and depth. In search of means for maximizing the productivity of each well that sometimes leads to looking for producing the maximum in the shortest possible time, these pumps are seen as a sort of panacea. In this work, a dangerous possible drawback is highlighted: if the system is not correctly designed, it can result in a perfect tool to generate very viscous asphaltene-stabilized emulsions. The behavior of the system is described along with the impacts generated on the pump. A verification criterion is proposed to be used during ESP design and selection of correct working conditions, and a case study is presented.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700