It is the key parameter of debris flow for computing discharge process, because the method calculating peak discharge of rainstorm will directly affect economic rationality, feasibility, safety and reliability of prevention program. According to survey standards of geological engineering construction, the author selected 3 various methods to calculate a certain engineering project, analyzed the calculated results.