The Xiluodu-Zhexi±800 kV UHV DC transmission line passes through the Xiangxi area where the traffic is very inconvenient,the ground is undulating and the geological conditions are complex.Engineering drilling work carried out in this region is very difficult.Preliminary exploration data show that at the limestone area,karst development is strongly.Tower pad stability can face safety threats.At the sandstone district,the covering clay layer contains weathered debris.Ordinary twist drill is difficult to accurately determine the coverage layer thickness.In order to check the karst development situation and the bedrock surface depth,the ground penetrating radar was used to detect the strata after the pre-test demonstration.In addition to the ground penetrating radar detection on the ground,we also carried out the pile bottom detection in order to further investigate the karst development less than 5m under the bottom of the hole.Drilling and excavation results show that the ground penetrating radar can effectively detect the hidden karst,bedrock surface,weathered zone,fracture and fracture zone.It provides a scientific basis for reasonable choice tower bit and design foundation depth.It achieves a good application result.
© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号 地址:北京市海淀区学院路29号 邮编:100083 电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700 |